Powering the AI and Quantum build-out.
The compute is funded and the sites are chosen. Power is the constraint — and the equipment that delivers it on-site is what we finance.
Power replaced land as the constraint
Interconnection is the bottleneck, not real estate. Campuses with a path to on-site generation win the race to energization — and that path runs through hard-to-source turbines and gensets.
Buyers now outpace the available units. The operator who can secure a specific package — before it reaches the open market — is the one who brings capacity online on schedule. That is precisely where our capital works.
When OEM slots are stretched, transformers are long-lead, and grid timelines keep moving, secondary-market equipment is no longer just a backup plan — it becomes a way to hit commercial operation on time. That is exactly where First Power Capital works.
Projects run from 25 MW to 1 GW and beyond — and the unit that energizes the campus is the one secured before anyone else can reach it.
Financing the power, not the build
- We finance the turbines, gensets, and engines that power campuses on-site.
- Escrow deposits secure units and OEM slots ahead of the queue.
- Capital is secured against the specific asset and recycled at each close.
- We move on the timelines hyperscale deployment demands.