Data Centers

Powering the AI and Quantum build-out.

The compute is funded and the sites are chosen. Power is the constraint — and the equipment that delivers it on-site is what we finance.

The reset

Power replaced land as the constraint

Interconnection is the bottleneck, not real estate. Campuses with a path to on-site generation win the race to energization — and that path runs through hard-to-source turbines and gensets.

Buyers now outpace the available units. The operator who can secure a specific package — before it reaches the open market — is the one who brings capacity online on schedule. That is precisely where our capital works.

When OEM slots are stretched, transformers are long-lead, and grid timelines keep moving, secondary-market equipment is no longer just a backup plan — it becomes a way to hit commercial operation on time. That is exactly where First Power Capital works.

Projects run from 25 MW to 1 GW and beyond — and the unit that energizes the campus is the one secured before anyone else can reach it.

How we serve

Financing the power, not the build

  • We finance the turbines, gensets, and engines that power campuses on-site.
  • Escrow deposits secure units and OEM slots ahead of the queue.
  • Capital is secured against the specific asset and recycled at each close.
  • We move on the timelines hyperscale deployment demands.